Forged Double Tube Sheet Heat Exchanger
Negotiable | 1 Piece (MOQ) |
Min. Order:
1 Piece
Port:
Qingdao, China
Production Capacity:
300pieces/Month
Payment Terms:
L/C, T/T, D/P, Western Union, Paypal, Money Gram
Zhangqiu Yu Bin Petrochemical Fittings Factory
Shandong, China
Last Login Date:
Jun 23, 2025
Main Products:
Forging Ring, Steel Sleeve, Shaft, Tube Sheet, Flange, CNC Machining Aluminum, Gear, Mould Base, Dish Head, Grinding Ball
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
OEM&ODM
Processing Object
Metal
Molding Style
Forging
Molding Technics
Pressure Casting
Application
Machinery Parts
Material
Steel, Stainless Steel
Heat Treatment
Normalizing
Surface Treatment
Zinc Plating, as Per Requirement
Forging Tolerance
+/-0.1mm
Standard
AISI, ANSI
Certification
CE, ISO 9001:2008
Connection
Welding
Head Type
Round
Trademark
Yu Bin
Transport Package
Fumigation Free Wooden Box
Specification
OEM&ODM
Origin
China
Product Description
Forged Double Tube Sheet Heat Exchanger
Production Description
Production Specification | According to PED4.3 instructions and the design of<Safety technical supervision rules for fixed pressure vessels>and the requirements of the industry standard. |
Material | Carbon steel,Stainless Steel,Duplex Stainless Steel,Copper,Clad Material, Titanium. |
Machining Range | Outside Diameter Max2500mm,Thickness Max500mm. |
Tube Hole Details | Positioning Precision Max0.01mm, hole diameter Min Tolerance 0.01mm, Min roughness Ra0.6 in the hole, accept expanded tube hole groove in the hole. |
Main Process | Forging,Overlay Welding,Explosion,Normalizing,Solid Solution,Turning, Milling,Drilling,Fraising,Boring,Boring Grooves. |
Main Detection | Chemical Composition,Mechanical Properties,PT,UT,Intercrystalline Corrosion,Clad Strength,Hardness,Size,Roughness. |
Main Markets | South Korea, Iran, Australia, Eastern Europe, Southern Europe, Indonesia. |
Provide Product Certificate | PED4.3 AD2000,EN10204-3.1(Certificate No.:DGR-0036-QS-W 728/2015/MUC) |
Products Show
Floating Tube sheet: | ||
Specifications:Φ930×430×38 Material:Muntz Metal Tube Hole:Φ12.71 +0.05/-0 | ||
Large Tube Hole Tube SheetSpecifications:Φ1530×58mm Material:16Mn Tube Hole:Φ76.55 +0.25/-0mm |
Tube Sheet | ||
Specifications | Φ1018×120mm | |
Material | X2CrNiMoN22-5-3 | |
Tube Hole | Φ25.3 +0.05/-0mm | |
Expanded Tube Hole Groove | 0.3mm(Wall Thickness |
Tube Sheet | ||
Specifications | Φ1220×80mm | |
Material | P295GH | |
Tube Hole | Φ25.3 +0.05/-0mm | |
Expanded Tube Hole Groove | 0.3mm(Wall Thickness) |
Copper Tube Sheet | ||
Specifications | 930×430×38mm | |
Material | Muntz Metal | |
Tube Hole | 12.71 +0.05/-0mm |
Clad Tube Sheet | ||
Specifications | Φ937×62mm | |
Material | A266-CL2+C46400 | |
Clad Method | Overlay Welding |
Our Factory
Since 1999 focus on the tube sheet's production and manufacture,fixed assets 15 million,covering an area of 40 thousand square meters,senior technicians 75 persons.Equipped with forging, heat treatment,CNC machining equipments more than 50 units.Has been obtained the qualification of China and European Union special equipment manufacturing.Is the top production manufacturer in the same industry.
Packaging Details
1.After antirust treatment or no need rust carry out sponges and winding membranes package.
2.All the products are packed in fully enclosed wooden cases. Wooden case is free fumigation and suitable for shipping, wooden inwall has anti bump and moistureproof film.
3.At the wooden case bottom have 180mm supporting leg, convenient forklift and crane lifting rope handling.
4.After packing finished use steel seal to sealing and fixing.
FAQ
Q: Are you trading company or manufacturer ?Since 1999 focus on the tube sheet's production and manufacture,fixed assets 15 million,covering an area of 40 thousand square meters,senior technicians 75 persons.Equipped with forging, heat treatment,CNC machining equipments more than 50 units.Has been obtained the qualification of China and European Union special equipment manufacturing.Is the top production manufacturer in the same industry.
Packaging Details
1.After antirust treatment or no need rust carry out sponges and winding membranes package.
2.All the products are packed in fully enclosed wooden cases. Wooden case is free fumigation and suitable for shipping, wooden inwall has anti bump and moistureproof film.
3.At the wooden case bottom have 180mm supporting leg, convenient forklift and crane lifting rope handling.
4.After packing finished use steel seal to sealing and fixing.
FAQ
A: We are factory.
Q: How long is your delivery time?A: Generally is 15-20 days, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?A: Due to our products are all customized, the sample may require higher costs. If customer willing to pay for the sample, we can provide it.
Q: What is your terms of payment ?A: Payment<2000USD:100% in advance.
Payment>2000USD: 50% prepayment+50% before shippment or L/C.
Cooperation more than one year high-quality customers, no prepayment or accept
Payment>2000USD: 50% prepayment+50% before shippment or L/C.
Cooperation more than one year high-quality customers, no prepayment or accept
Send your message to this supplier
People who liked this also liked